ADU Building
Our team has partnered with local builders to help our clients design and build high-quality ADUs that add value to their properties. We guide clients through every step—from planning and permitting to construction and completion—ensuring a smooth process and beautiful results. Whether you’re looking to create extra income or house family members, we have the tools to bring your ADU vision to life.

#1 Planning & Design
July 6, 2024
Every great ADU starts with a clear vision. During this stage, we finalize floor plans, materials, and design details to ensure the project meets your needs and budget.
#2 Site Preparation
September 4, 2024
The property is cleared, graded, and prepared for construction. Utilities and access points are planned to ensure a seamless process.


#3 Foundation Work
September 12, 2024
Plumbing groundwork is completed, and the foundation is poured. This step provides the structural base that supports the entire ADU.
#4 Framing & Structure
October 2, 2024
Walls, floors, and roof framing go up, bringing the design to life. You’ll start to see the true size and layout of your new space take shape.


#5 Plumbing, Electrical, & HVAC
October 3, 2024
All essential systems are installed and tested. This includes running pipes, wiring, and ductwork to ensure your ADU functions efficiently and safely.
#6 Doors & Windows
October 18, 2024
Exterior doors and windows are installed for security, energy efficiency, and curb appeal. This step seals the structure from the elements and adds character.


#7 Exterior Work
October 31,2024
The exterior walls are wrapped, waterproofed, and prepared for stucco. These steps protect the home from moisture and improve long-term durability.
#8 Roofing & Tile Work
November 1, 2024
Roofing paper is laid, and tiles are placed. Once finished, the ADU is fully protected from the weather, so interior work can begin.


#9 Insulation & Drywall
November 2, 2024
Insulation is placed in walls and ceilings to regulate temperature and sound. Drywall installation follows, creating smooth, paint-ready surfaces.
#10 Stucco
November 4, 2024
Stucco is applied in multiple coats to achieve a clean, durable exterior finish. This step gives the ADU its signature look and lasting weather protection.


#11 Septic Tank
November 19, 2024
The septic tank is installed to handle wastewater safely and efficiently. This step ensures your ADU meets all environmental and health standards.
#12 Interior Finishes
November 19, 2024
Flooring, cabinets, countertops, paint, and hardware are picked out to bring personality to the space. Each room begins to reflect the chosen design style and finishes.


#13 Leach Lines
November 27, 2024
Leach lines are installed and connected to the septic system for proper drainage. This phase is essential for maintaining long-term system function.
#14 Cabinets & Countertops
December 13, 2024
Custom cabinetry and countertops installed. The kitchen and bathrooms start to take shape with the finishes selected.


#15 Bathrooms
December 16, 2024
Vanities, fixtures, tile, and mirrors are installed to complete the bathrooms. Each detail is decided on by the client.
#16 Backsplash
December 18, 2024
The backsplash is installed to fill the wall between the countertops and cabinets


#17 Flooring
January 2, 2025
Luxury vinyl plank, tile, or hardwood flooring is installed throughout. This step ties the home together and enhances the overall look and feel.
#18 Driveway
January 22, 2025
Concrete is poured and finished for the driveway and walkways. This provides smooth, durable access to the ADU while enhancing curb appeal.


#19 Fencing
January 30, 2025
Perimeter and privacy fencing are built to define the property and mark property lines.
#20 Finished ADU
February 12, 2025
The ADU is complete, cleaned, and ready for move-in. Every detail comes together to create a high-quality living space built custom to you.